In observance of the Christmas holidays, Railroad Commission of Texas offices will be closed December 23-27. The offices will re-open at 8 a.m. on Monday, December 30 for regular business. Expedited Drilling Permits will be processed within standard processing times. If assistance is needed, please email Drillingpermits-info@rrc.texas.gov.
RRC maintains a 24-hour emergency phone line to report any leaks or spills. That number is 844-773-0305

USA Flag

This website will be undergoing maintenance today, please be patient as some pages may be slower to load.

Abandoned Mine Land Reclamation Projects Gallery

MALAKOFF ABANDONED LIGNITE MINE

Located in Henderson County
Mined prior to 1950

Malakoff BeforeBefore

Project Scope

  • One large 20 feet deep by 125 feet wide slump
  • Four smaller 10-4 feet deep by 38-17 feet wide slumps
  • Located in close proximity to residential areas
  • Eliminate safety hazards posed by slumps which were deep and steep, and were obscured and abrupt when encountered

Reclamation Accomplishments

  • Collapsed unconsolidated materials around openings
  • Backfilled with clay material and compacted
  • Top soil placed over compacted fill
  • Performed operations to re-establish vegetation

Malakoff AfterAfter

Contracted Cost - $59,900
Funded by the federal Office of Surface Mining Reclamation and Enforcement through a production fee levied on active coal mining operations in Texas.


STOELTJE ABANDONED URANIUM MINE

Located in Karnes County
Mined prior to 1976

Stoeltje Before
Before

Project Scope

  • 77 acres
  • 25 acre pit, highwalls (pit walls) average 40 feet in height above water level
  • 3,400 linear feet of highwall
  • Pit water depth 120 feet
  • 52 acres naturally occurring radioactive and acidic spoil material
  • Spoil ridges up to 65 feet in height

Reclamation Accomplishments

  • Eliminated dangerous highwalls
  • 14% maximum graded slopes
  • Burial of 650,000 cubic yards of naturally occurring radioactive and acidic spoil materials
  • Eliminated the hazardous water body
  • Completed grading with 1,770,734 cubic yards of clean spoil material
  • Reduced maximum gamma radiation levels to 26 mR/hr and average readings of 11 mR/hr  

Stoeltje After
After

Contracted Cost - $5,359,865
Funded by the federal Office of Surface Mining Reclamation and Enforcement through a production fee levied on active coal mining operations in Texas.


ADOBE WALLS/TERLINGUA/STUDY BUTTE ABANDONED MINES

Located in Brewster and Presidio Counties
Mined prior to 1974

Adobe Walls Before
Before

Adobe Walls AfterAfter

 

Adobe Walls Before
Before

Project Scope

  • Several main shaft openings and other associated smaller subsidence features
  • Steep, loose spoil piles in proximity to mine shafts
  • Eliminate safety hazards to frequent visitors from nearby off-road trails
  • Repair previous AML closures damaged from weather and vandalism

Reclamation Accomplishments

  • Closed eight openings with on site spoil material
  • Repaired two previous AML closures that had been damaged
  • Installed cable net over Study Butte shaft
  • Filled in several subsidence features adjacent to mine shafts

Adobe Walls After
After

Contracted Cost - $73,542
Funded by the federal Office of Surface Mining Reclamation and Enforcement through a production fee levied on active coal mining operations in Texas.


ALCOA AREA F ABANDONED LIGNITE MINE

Located in Milam County
Mined prior to 1963

Alcoa Before
Before

 

Project Scope

  • 122 acres
  • 16 acre pit
  • Pit water depth 50 feet
  • Spoil ridges 73 feet high
  • Within 100 feet of a county road

Reclamation Accomplishments

  • 5 - 14% slopes
  • Pumped 110 million gallons of pit water
  • 1,658,000 cubic yards of earthwork
  • Lime treatment of naturally occurring acidic spoil - 5,870 tons

Alcoa Area F After
After

 

Contracted Cost - $2,560,600
(Does not include cost incurred by Alcoa, Inc. to grade 28 acres of the project area.)
Funded by the federal Office of Surface Mining Reclamation and Enforcement through a production fee levied on active coal mining operations in Texas.


WEDDINGTON NORTH ABANDONED URANIUM MINE

Located in Karnes County
Mined prior to 1976

Weddington North Before
Before

Project Scope

  • 64 acres
  • 20 acre pit, highwalls (pit walls) 30 - 80 feet
  • Pit water depth 45 feet
  • 13.7 acres of naturally occurring radioactive and acidic spoil material

Reclamation Accomplishments

  • 5 - 14% slopes
  • Pumped 42 million gallons of pit water
  • Buried 48,167 cubic yards of naturally occurring radioactive and acidic spoil in pit bottom
  • 302,179 cubic yards of earthwork

Weddington North After
After

Contracted Cost - $1,616,571
Funded by the federal Office of Surface Mining Reclamation and Enforcement through a production fee levied on active coal mining operations in Texas.


MABEL NEW-SUPERIOR ABANDONED URANIUM MINE

Located in Live Oak County
Mined prior to 1961

Mabel Before
Before

Mabel During Reclamation
During Reclamation

Mabel After
After

Project Scope

  • 85 acres
  • 3 pits(12.7 acres) – averaging 35 feet deep
  • 11,337 linear feet pit highwalls (pit walls)
  • Multiple spoil piles (72.3 acres) containing naturally occurring radioactive materials

Reclamation Accomplishments

  • 5 – 10% slopes
  • Buried naturally occurring radioactive and acidic spoil in pit bottom
  • 330,000 cubic yards of earthwork
  • Recipient of the federal Office of Surface Mining Reclamation and Enforcement’s 2009 Mid-Continent Regional Award for Abandoned Mine Land Reclamation

Contracted Cost - $2,296,131
Funded by the federal Office of Surface Mining Reclamation and Enforcement through a production fee levied on active coal mining operations in Texas.


 

BROWN ABANDONED URANIUM MINE

Located in Karnes County
Mined prior to 1974

Brown Abandoned Mine Before
Before

Project Scope

  • 15 acre pit
  • Pit water depth 65 feet
  • 3,200 linear feet of highwall (pit walls), 73 feet high
  • 33 acres of abandoned spoil
  • Within 200 feet of a county road

Reclamation Accomplishments

  • 14% maximum graded slopes
  • Pumped 110 million gallons of pit water
  • Burial of 500,000 cubic yards of naturally occurring radioactive and acidic spoil materials
  • Completed grading with an additional 1,320,000 cubic yards of clean spoil material

Brown Abandoned Mine After Reclamation

Contracted Cost - $3,930,856
Funded by the federal Office of Surface Mining Reclamation and Enforcement through a production fee levied on active coal mining operations in Texas.