New Pipeline Construction Reports
New pipeline construction reports are required by 16 TAC §8.115 "New Construction Commencement Report". Generally, the required Form PS-48 pertains to transmission lines, gathering lines inside a (non-rural or) Class 2, 3 or 4 location and certain distribution systems. The notification is due 30 or 60 days before construction starts depending on the project, specific reporting requirements can be found in 16 TAC §8.115.
Effective September 1, 2023, new construction reports must be submitted using the Pipeline, Inspection, Permitting and Evaluation System (RRC PIPES) application. Monthly reports outlined in 16 TAC 8.115(a)(4)(B) and 8.115(a)(5)(B) may be emailed to PS-48Reports@rrc.texas.gov to read the full NTO please visit https://www.rrc.texas.gov/announcements/060623-nto-new-construction-reports-online-filing-mandatory-september-1/
If you have any questions regarding this notice, please contact RRC Pipeline Safety Department at safety@rrc.texas.gov.
The following documents are formatted as PDF
- 2024 Calendar Year Pipeline Construction
- 2023 Calendar Year Pipeline Construction
- 2022 Calendar Year Pipeline Construction
- 2021 Calendar Year Pipeline Construction
- 2020 Calendar Year Pipeline Construction
- 2019 Calendar Year Pipeline Construction
- 2018 Calendar Year Pipeline Construction
- 2017 Calendar Year Pipeline Construction
- 2016 Calendar Year Pipeline Construction
- 2015 Calendar Year Pipeline Construction
- 2014 Calendar Year Pipeline Construction
- 2013 Calendar Year Pipeline Construction
- 2012 Calendar Year Pipeline Construction
- 2011 Fiscal Year Pipeline Construction
- 2010 Fiscal Year Pipeline Construction
- 2009 Fiscal Year Pipeline Construction
- 2008 Fiscal Year Pipeline Construction