Holiday Office Closure

In observance of the Christmas holidays, Railroad Commission of Texas offices will be closed December 23-27. The offices will re-open at 8 a.m. on Monday, December 30 for regular business. Expedited Drilling Permits will be processed within standard processing times. If assistance is needed, please email Drillingpermits-info@rrc.texas.gov.
RRC maintains a 24-hour emergency phone line to report any leaks or spills. That number is 844-773-0305

USA Flag

This website will be undergoing maintenance today, please be patient as some pages may be slower to load.

Notice to Oil & Gas and Pipeline Operators: Form CI-D and Form CI-X Online Filing Requirement

August 03, 2022

Beginning August 1, 2022, the Railroad Commission of Texas (RRC) is requiring oil and gas operators to file the Form CI-D, Acknowledgement of Critical Customer/Critical Gas Supplier Designation, and Form CI-X, Critical Designation Exception Application, using the RRC Online System at https://webapps.rrc.texas.gov/security/login.do. The deadline to complete online submissions is Thursday, September 1, 2022. Hard copy form or email form submissions will no longer be accepted. Forms CI-D and CI-X are now required to be filed through RRC Online.

Form CI-D would be submitted by an operator of a facility designated as critical acknowledging the facility’s critical status based on 16 Texas Administrative Code (TAC) §3.65 and 16 TAC §25.52.

Form CI-X would be submitted by an operator certifying a facility seeks an exception to critical designation based on 16 TAC §3.65 and Texas Natural Resource Code §91.143. 

To view the full notice, visit the RRC website at https://www.rrc.texas.gov/media/5htdu3gy/2022_nto-form-ci-d-and-form-ci-x-online-filing-rrc.pdf.


Commissioners