Use of Downhole Hydrocyclone Oil-Water Separators
Summary of Permitting Requirements
Wellbore Sketch | Current fluid level or formation pressure | Proposed Water:Oil Ratio |
Proposed bottomhole injection pressure | |
Production above Injection (P/I) Both zones are within the same reservoir |
Required | Required | Not Required | Required |
Production above Injection (P/I) Injection zone is in a different reservoir |
Required | Required | Required | Required |
Injection above Production (I/P) | Required | Required | Required | Required |
Initial MIT | Subsequent MIT | Tubing-casing annulus monitoring | Measure fluid level | Water : Oil Ratio | |
Conventional injection wells | Pressure test 200 psi min. 500 psi max. |
After each workover, every 5 years with full surface casing, annually without | Weekly if any part of the groundwater is protected only be uncemented casing | - | - |
Production Above Injection (P/I) Both zones are within the same reservoir | Pressure test or Ada test 200 psi. |
After each workover, at least eevery 10 years | - | Quarterly | - |
Production Above Injection (P/I) Injection zone is in the different reservoir | Pressure test or Ada test 200 psi. |
After each workover, at least eevery 10 years | - | Quarterly | 1:1 min. |
Injection Above Production (I/P) Surface casing is set and cemented through the entire zone of usable quality groundwater | Pressure test 200 psi. |
After each workover, at least eevery 5 years | Monthly* | - | 1:1 min |
Injection Above Production (I/P) Surface casing is not set and cemented through the entire zone of usable quality groundwater | Pressure test 200 psi. |
After each workover, at least every 3 years | Weekly | - | 1:1 min. |